The G-frame team is currently on site installing the mass timber structure for this new reception building which features a large cantilevered overhang on three sides and a complex diagrid roof formed of 22.5 metre Birch glulam primary beams. Mass timber designed, supplied and installed by G-frame Structures Ltd.